McNeil HS PH6 Area C

Austin, TX

Addition to existing McNeil HS – Ground Up 15,000SF building  – this included office space, class rooms, and restrooms; Live Oak Construction completed the engineered exterior metal framing, blocking, sheathing, and interior metal stud framing, drywall, insulation, wall panels, and acoustical systems.

Contractor: Cadence McShane
Architect: Perkins & Will
Completed: 2018